50 Product Results Found for "te-HVAC"
Find a huge range of Power Line Filters at element14 Taiwan. We stock a large selection of Power Line Filters, including new and most popular products from the world's top manufacturers including: TE Connectivity - Schaffner & TE Connectivity - Corcom
View
Buyer
Engineer
Manufacturer
Filter Applications
Voltage Rating
Current Rating
No. of Phases
No. of Stages
Filter Mounting
Filter Input Terminals
Filter Output Terminals
Product Range
Packaging
No Filter(s) Applied
0 Filter(s) Selected
| Compare | Price For | Quantity | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
TE CONNECTIVITY - SCHAFFNER | Each | 1+ NT$9,394.000 5+ NT$9,206.120 10+ NT$9,018.240 | Total:NT$9,394.00 Min: 1 / Mult: 1 | General Purpose | 480VAC | 42A | Three Phase | 1 Stage | Chassis Mount | Terminal Block | Terminal Block | - | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$9,925.940 5+ NT$9,808.940 10+ NT$9,691.940 | Total:NT$9,925.94 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 440VAC | 55A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - SCHAFFNER | Each | 1+ NT$8,095.770 5+ NT$7,922.790 10+ NT$7,749.810 | Total:NT$8,095.77 Min: 1 / Mult: 1 | General Purpose | 480VAC | 30A | Three Phase | 1 Stage | Chassis Mount | Terminal Block | Terminal Block | FN 3258 Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$8,447.200 5+ NT$8,333.810 10+ NT$8,333.800 | Total:NT$8,447.20 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 440VAC | 30A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$26,959.850 | Total:NT$26,959.85 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 150A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$5,602.760 5+ NT$5,579.750 10+ NT$5,579.740 | Total:NT$5,602.76 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 7A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEV-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$14,550.790 5+ NT$14,492.320 10+ NT$14,492.310 | Total:NT$14,550.79 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 75A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$12,968.470 | Total:NT$12,968.47 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 440VAC | 75A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$12,494.530 5+ NT$10,932.710 10+ NT$9,058.530 | Total:NT$12,494.53 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 440VAC | 42A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$15,391.920 | Total:NT$15,391.92 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 75A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEV-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$10,771.660 5+ NT$9,425.200 10+ NT$7,809.450 | Total:NT$10,771.66 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 16A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$17,063.750 | Total:NT$17,063.75 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 440VAC | 100A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$9,822.510 5+ NT$9,782.720 10+ NT$9,782.710 | Total:NT$9,822.51 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 42A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$4,265.940 | Total:NT$4,265.94 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 440VAC | 7A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$9,037.560 5+ NT$8,845.590 10+ NT$8,653.610 | Total:NT$9,037.56 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 30A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$10,237.940 | Total:NT$10,237.94 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 55A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$9,759.680 | Total:NT$9,759.68 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 30A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEV-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$32,840.130 5+ NT$32,452.750 10+ NT$32,065.360 | Total:NT$32,840.13 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 150A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEV-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$17,746.380 | Total:NT$17,746.38 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 100A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEH-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$7,884.000 | Total:NT$7,884.00 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 520VAC | 16A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEV-BS Series | ||||
TE CONNECTIVITY - CORCOM | Each | 1+ NT$7,508.450 | Total:NT$7,508.45 Min: 1 / Mult: 1 | AC/DC Drives, HVAC, Robotics, UPS | 440VAC | 16A | Three Phase | 2 Stage | Chassis Mount | Terminal Block | Terminal Block | KEV-BS Series | ||||
TE CONNECTIVITY - SCHAFFNER | Each | 1+ NT$6,717.820 5+ NT$6,583.470 10+ NT$6,449.110 | Total:NT$6,717.82 Min: 1 / Mult: 1 | General Purpose | 520VAC | 16A | Three Phase | 1 Stage | Chassis Mount | Terminal Block | Terminal Block | - | ||||
TE CONNECTIVITY - SCHAFFNER | Each | 1+ NT$17,588.990 5+ NT$16,491.250 10+ NT$15,393.500 | Total:NT$17,588.99 Min: 1 / Mult: 1 | General Purpose | 480VAC | 75A | Three Phase | 1 Stage | Chassis Mount | Terminal Block | Terminal Block | - | ||||
Each | 1+ NT$6,377.130 5+ NT$6,143.730 10+ NT$5,926.630 | Total:NT$6,377.13 Min: 1 / Mult: 1 | Machine Builders, Climate Solution, Renewable Energy, Energy Storage, EV Charging Stations, HVAC | 530VAC | 8A | Three Phase | 2 Stage | Chassis Mount | Push-In | Push-In | FN3298 Series | |||||
Each | 1+ NT$10,522.630 5+ NT$10,137.510 10+ NT$9,779.270 | Total:NT$10,522.63 Min: 1 / Mult: 1 | Machine Builders, Climate Solution, Renewable Energy, Energy Storage, EV Charging Stations, HVAC | 530VAC | 36A | Three Phase | 2 Stage | Chassis Mount | Push-In | Push-In | FN3298 Series | |||||

















