19 Positions Sensor Cable Assemblies:
30 Products FoundFind a huge range of 19 Positions Sensor Cable Assemblies at element14 Taiwan. We stock a wide range of Sensor Cable Assemblies, such as 4 Positions, 5 Positions, 3 Positions & 8 Positions Sensor Cable Assemblies from the worlds top manufacturers including: Banner Engineering, Molex, Weidmuller, Lumberg Automation & Harting
View
Buyer
Engineer
Manufacturer
Connector Type A
Connector Type B
No. of Positions
Cable Length - Metric
Cable Length - Imperial
Product Range
Packaging
Filter(s) Applied
1 Filter(s) Selected
| Compare | Price For | Quantity | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
LUMBERG AUTOMATION | Each | 1+ NT$5,661.270 5+ NT$5,292.140 10+ NT$4,923.010 25+ NT$4,746.270 50+ NT$4,651.350 More Pricing... | Total:NT$5,661.27 Min: 1 / Mult: 1 | 0 | Free End | 19 Positions | 5m | 16.4ft | RKU Series | ||||
Each | 1+ NT$3,435.810 5+ NT$3,243.630 10+ NT$3,051.460 25+ NT$3,038.880 50+ NT$3,026.300 | Total:NT$3,435.81 Min: 1 / Mult: 1 | - | Free End | 19 Positions | 5m | - | - | |||||
4758794 | BANNER ENGINEERING | Each | 1+ NT$10,864.100 | Total:NT$10,864.10 Min: 1 / Mult: 1 | M23 Receptacle | M23 Plug | 19 Positions | 20m | 65.6ft | BC-M23F19 Series | |||
4758798 | BANNER ENGINEERING | Each | 1+ NT$9,180.800 | Total:NT$9,180.80 Min: 1 / Mult: 1 | M23 Receptacle | Free End | 19 Positions | 20m | 65.6ft | BC-M23F19 Series | |||
4758790 | BANNER ENGINEERING | Each | 1+ NT$7,191.790 | Total:NT$7,191.79 Min: 1 / Mult: 1 | M23 Receptacle | M23 Plug | 19 Positions | 10m | 32.8ft | BC-M23F19 Series | |||
4758793 | BANNER ENGINEERING | Each | 1+ NT$5,355.630 | Total:NT$5,355.63 Min: 1 / Mult: 1 | M23 Receptacle | M23 Plug | 19 Positions | 2m | 6.56ft | BC-M23F19 Series | |||
4758792 | BANNER ENGINEERING | Each | 1+ NT$9,027.940 | Total:NT$9,027.94 Min: 1 / Mult: 1 | M23 Receptacle | M23 Plug | 19 Positions | 15m | 49.2ft | BC-M23F19 Series | |||
4758797 | BANNER ENGINEERING | Each | 1+ NT$7,344.640 | Total:NT$7,344.64 Min: 1 / Mult: 1 | M23 Receptacle | Free End | 19 Positions | 15m | 49.2ft | BC-M23F19 Series | |||
4758795 | BANNER ENGINEERING | Each | 1+ NT$5,355.630 | Total:NT$5,355.63 Min: 1 / Mult: 1 | M23 Receptacle | M23 Plug | 19 Positions | 5m | 16.4ft | BC-M23F19 Series | |||
4758799 | BANNER ENGINEERING | Each | 1+ NT$3,698.740 | Total:NT$3,698.74 Min: 1 / Mult: 1 | M23 Plug | Free End | 19 Positions | 2m | 6.56ft | BC-M23M19 Series | |||
Each | 1+ NT$3,938.690 5+ NT$3,859.920 10+ NT$3,847.450 | Total:NT$3,938.69 Min: 1 / Mult: 1 | M23 Receptacle | Free End | 19 Positions | 5m | 16.4ft | - | |||||
4758800 | BANNER ENGINEERING | Each | 1+ NT$3,698.740 | Total:NT$3,698.74 Min: 1 / Mult: 1 | M23 Plug | Free End | 19 Positions | 5m | 16.4ft | BC-M23M19 Series | |||
4758796 | BANNER ENGINEERING | Each | 1+ NT$3,698.740 | Total:NT$3,698.74 Min: 1 / Mult: 1 | M23 Receptacle | Free End | 19 Positions | 1m | 3.28ft | BC-M23F19 Series | |||
3498119 RoHS | Each | 1+ NT$5,596.660 5+ NT$5,279.120 10+ NT$5,046.120 25+ NT$4,849.940 50+ NT$4,688.350 More Pricing... | Total:NT$5,596.66 Min: 1 / Mult: 1 | 0 | Free End | 19 Positions | 5m | 16.4ft | Brad 120094 Series | ||||
LUMBERG AUTOMATION | Each | 1+ NT$8,538.870 5+ NT$8,071.420 10+ NT$7,603.960 25+ NT$7,331.020 50+ NT$7,184.400 More Pricing... | Total:NT$8,538.87 Min: 1 / Mult: 1 | 0 | Free End | 19 Positions | 10m | 33ft | RKU Series | ||||
Each | 1+ NT$5,198.850 5+ NT$4,923.140 10+ NT$4,728.750 25+ NT$4,544.420 50+ NT$4,483.010 More Pricing... | Total:NT$5,198.85 Min: 1 / Mult: 1 | 90° M23 Receptacle | Free End | 19 Positions | 15m | 49.2ft | RKWU Series | |||||
Each | 1+ NT$4,512.790 5+ NT$4,339.480 10+ NT$4,216.980 25+ NT$4,064.370 50+ NT$3,927.960 More Pricing... | Total:NT$4,512.79 Min: 1 / Mult: 1 | 0 | Free End | 19 Positions | - | - | - | |||||
PHOENIX CONTACT | Each | 1+ NT$7,574.740 5+ NT$7,423.250 10+ NT$7,271.760 25+ NT$7,120.260 50+ NT$6,968.770 | Total:NT$7,574.74 Min: 1 / Mult: 1 | 0 | Free End | 19 Positions | 10m | 33ft | - | ||||
Each | 1+ NT$4,512.790 5+ NT$4,339.480 10+ NT$4,216.980 25+ NT$4,064.370 50+ NT$3,927.960 More Pricing... | Total:NT$4,512.79 Min: 1 / Mult: 1 | 0 | Free End | 19 Positions | - | - | - | |||||
Each | 1+ NT$4,335.440 5+ NT$4,248.740 10+ NT$4,162.030 25+ NT$4,075.320 50+ NT$3,988.610 More Pricing... | Total:NT$4,335.44 Min: 1 / Mult: 1 | 0 | Free End | 19 Positions | - | - | - | |||||
Each | 1+ NT$4,357.400 5+ NT$4,270.260 10+ NT$4,183.110 25+ NT$4,095.960 50+ NT$4,008.810 More Pricing... | Total:NT$4,357.40 Min: 1 / Mult: 1 | 0 | Free End | 19 Positions | - | - | - | |||||
3498118 RoHS | Each | 1+ NT$9,792.630 5+ NT$9,058.930 10+ NT$8,325.220 25+ NT$7,896.480 50+ NT$7,738.560 More Pricing... | Total:NT$9,792.63 Min: 1 / Mult: 1 | 0 | Free End | 19 Positions | 10m | 32.8ft | 120094 | ||||
Each | 1+ NT$3,372.900 10+ NT$3,215.960 25+ NT$3,137.640 50+ NT$2,949.250 100+ NT$2,823.750 | Total:NT$3,372.90 Min: 1 / Mult: 1 | 90° M23 Receptacle | Free End | 19 Positions | 5m | - | - | |||||
Each | 1+ NT$3,938.690 5+ NT$3,859.920 10+ NT$3,789.700 | Total:NT$3,938.69 Min: 1 / Mult: 1 | M23 Receptacle | Free End | 19 Positions | 2m | 6.6ft | - | |||||
Each | 1+ NT$4,266.920 5+ NT$4,181.590 10+ NT$4,105.040 | Total:NT$4,266.92 Min: 1 / Mult: 1 | M23 Receptacle | Free End | 19 Positions | 5m | 16.4ft | - | |||||













